Algorand Mainnet Upgrade
Scheduled Maintenance Report for Coinbase Pro
Completed
The scheduled maintenance has been completed.
Posted Dec 17, 2019 - 21:33 PST
In progress
The Algorand Mainnet has begun a network upgrade. We temporarily paused ALGO deposits/withdrawals to/from Coinbase Pro at approximately 7:33 PM PST December 17, and will re-enable deposits/withdrawals once we have determined the upgrade is stable.
Posted Dec 17, 2019 - 19:30 PST
Scheduled
On December 17 at 7:30 PM PST, Algorand Mainnet is expected to undergo a network upgrade. When the upgrade begins, we will temporarily pause ALGO deposits/withdrawals to/from Coinbase Pro, and we will re-enable deposits/withdrawals once we have determined the upgrade is stable.
Posted Dec 17, 2019 - 17:50 PST
This scheduled maintenance affected: Transfers (ALGO Network).